CivMetrix

Site management for civil contractors

Know what you've earned before you claim it.

CivMetrix measures the work, costs it against your rates, and produces the certificate. So nothing you built goes unclaimed — and every figure can be traced back to the day it was done.

Built on site, in Eswatini — for contractors who measure in the rain.

Cumulative position Contract to date
3.0M1.5M0
Certified Paid Cost
E 0
certified and not yet in the bank — the number most contractors only discover at month end.

What it fixes

Work gets built. Then it has to be proved.

Every one of these costs real money, and none of them show up until someone goes looking.

"We built it. Nobody measured it."

Quantities live in a foreman's head and a wet notebook. By claim day the detail is gone, so it gets estimated down to be safe.

"The rate was fine. The productivity wasn't."

An item loses money for three months before anyone compares what it cost to build against what it earns.

"That variation was never claimed."

Extra work is instructed on site, done, and forgotten — because nothing connected the instruction to a quantity.

"Which certificate has actually been paid?"

Certified is not the same as received. The gap between them is your money, funding somebody else's project.

"The storeman left. So did the fuel."

Deliveries, issues and stock counts in three different books that never reconcile to each other.

"He signed two timesheets that week."

A worker moves between gangs and appears on both. Payroll pays it, and nobody catches it until the audit.

Who uses it

One record, entered by the person who was there.

Site staff capture what they already know. Everything above them — the costing, the certificate, the board report — is built from that, not re-typed.

Foreman

The day, as it happened

Who worked, on what activity, for how long. Plant hours read off the meter. Transfers between gangs recorded once, not signed twice.

Storeman

Stock that reconciles

Materials issued against activities. Fuel requested, received, issued and counted in one closed cycle, so a shortfall is visible the day it happens.

Quantity Surveyor

Measured, then certified

Take-off against the drawing register, linked to BOQ items. Rate variance per activity. Certificates that carry the measurement behind every quantity.

Contracts Manager

The commercial position

Cost, certified value, cash received and budget read against each other — with the findings written out, not left as four lines on a chart.

Director

Where the money is

Margin, cash position, what's outstanding and how long the client takes to pay. The questions you'd ask at a monthly review, answered before you ask.

Everyone

Works on a phone

Captured on site, on whatever device is in a pocket. No installation, no licences per seat, no server in an office.

What it produces

Documents you can hand to a client.

Not screens — controlled forms, with your letterhead, document numbers and signature blocks. The register below is what comes out of it.

QS-IPC-01 Interim Payment CertificateQuantities, rates and value, with the measurement behind each line Signed · QS + Client
QS-MS-01 Measurement SheetDimensions, locations and dates, tied to the IPC it supports Signed · QS
HR-WTS-01 Weekly Time SheetOne sheet per foreman, start and finish times, employee signature Signed · Foreman + Manager
PL-MPR-01 Monthly Plant ReturnHours from the meter, downtime, inclement weather, agreed hours Signed · Plant + Client
ST-FSL-01 Fuel Stock LedgerEvery receipt and issue in one ordered ledger with a running balance Signed · Stores
CM-CST-01 Costing ReportCost by type and month, budget variance, and the commercial position Internal
QS-DWG-01 Drawing Control RegisterQuantity per element, consumed against measured, variation warnings Signed · QS

Get started

Bring one site onto it.

The fastest way to judge this is against work you already know. Send a BOQ and a month of records, and see the certificate it produces.

Book a walkthrough